Production of Laundry Soap
Equipment:
mixer with stirrer, casting moulds, heater,
cutter (knife), shaping machine, hydrometer, weighing scale, measuring
container and packaging materials.
Formation Table:
|
Chemical
|
Quantity
|
|
Caustic soda
|
1 Kg
|
|
Palm kernel oil
|
6 Litres
|
|
Soda ash
Silicate
|
0.25 kg
0.4 Litres
|
|
Sodium sulphate
|
3 kg
|
|
Colorant
|
To taste
|
|
water
|
4.5 Litres
|
|
Fragrance
|
To taste
|
|
Forming agent
|
250 mls
|
Procedure:
Prepare the caustic soda solution by dissolving 1kg of
caustic soda in 4.5litres of water, confirm that it was a density of 127kg/m3.
Allow the solution to stand and blend for at least three days. Please ensure that
you leave them to stand to stand for this time or even more (the longer the
better), to avoid your soap being corrosive the users’ skin and cloths.
1.
Add the soda ash to the caustic soda solution
and stirring vigorously until well blended.
2.
Add all the colorant to the solution and
continue stirring
3.
Add all the P.K.O into the mixer and continue
stirring vigorously in a
clockwise direction only for some time.
4.
Add the forming agent and silicate and continue
stirring
5.
Add the fragment and pour into mould and allow
solidification for 24 hours
6.
Stamp, shape and package and you are ready for
market.
Production of Powdery Detergent
Equipment:
same as in the production of laundry soap drier and pulverizer (mesh net)
Raw Material Quantity
p.k.o or fatty acid 4
litres
caustic soda 1 kg
soda ash 3
kg
hydrogen peroxide (H2O2) ¼
litres
ammonium 120
mls
industrial salt (Na2CO3) ¼
cup
colourant to
taste
perfume to
taste
foaming Agent 250
mls
sulphoric acid 30
mls
procedure
1.
Prepare the caustic soda solution as described
in the production of laundry soap and ensure that the density is at stated
value. Allow to stand for three day 72 hours) minimum. You can all it to stand
for more that 3 days if you want but should not use when it is not up to 3 days
to. The reason why some powerdery soap is corrosive is because the caustic soda
not blend long enough in water before starting the process
2.
Add the soda ash to the caustic soda solution
and stir until uniformly blended
3.
Add the colorant to the solution and pour
the p.k. o into the mixer and while
stirring vigorously
(only in clockwise direction ) till it blends well
4.
Add the
ammonium, industrial salt, fuming agent, sulphoric, perfume and finally
hydrogen peroxide into the mixture while stirring vigorously .
5.
Pour into a dryer for drying or spread under the
sun to dry
6.
After drying pulverize or grate and then sieve
7.
Package into sachets for sales
Production of Tile Cleaner
Equipment:
Weighing scale, mixing chamber, measuring cylinder,
sieving machine, stirrer
Formulation table
Raw material Quantity
HCL 1.5
liters
Sulphonic acid 0.75
liters
Glycerin (optional) 250
mls
Water 30
liters
Hydrogen per oxide 0.75
liters
Procedure
1.
Measure out of the HCL into a bowl
2.
Weigh out the sodium hydroxide into the same
bowl
3.
Add 5 liters fo water and stir very well
4.
Leave it for 3 hours and add the remaining 25
liters of water
5.
Stir very well and leave for over night
6.
Sieve out and add the hydrogen peroxide
7.
Stir well and package
Production of Shaving Powder
Equipment :
Mixing chamber and stirrer
Raw material Quantity
Talc 5kg
Kaolin 1.4kg
Magnesium carbonate 1.2kg
Cetyl alcohol 300g
Glycerol mono stearate 100kg
Zinc stearate 400g
Zinc oxide 550g
Perfume As desired
Procedure
1.
Measure all the ingredient above into a mixing
chamber
2.
Mix until a homogenous powder is obtained
3.
Package into containers
Production of After Shave
Equipment:
Measuring cylinder, mixing chamber , stirrer
Formulation table
Raw material Quantity
Ethyl alcohol 1 liter
Propylene glycol 30 mls
Water 0.5 liter
Fragrance As desired
Colourant As desired
Menthol 10g
Procedure
1. Dissolve
the perfume and propylene glycol in the alcohol.
2. Add
water slowly and stir well
3. Allow
the solution to stand for several hours
4. Filter
and pack into containers